Thursday, February 11, 2016

Final Walk though


So we close in 1 day and had our walk through today. The counters did get installed and they look great, better than what we thought they would. After picking all of our options we started second guessing everything. So many thoughts were running through our minds of all the choices. Is it all going to go together? How’s it going to look? Did we do ok? Are we going to like it? Basically we drove ourselves crazy for 3 months. All turned out great though.

We showed up to the meeting a few minutes early and went ahead and headed in. As soon as we entered the house there was a worker still doing some small touch ups. This didn’t surprise us with how behind they seemed to be during the whole building process though. After our PM arrived we went through the house. We tested everything lights, water (cold/hot), dishwasher, and even the jetted tub. We noticed that a lot of the closets had not been touched up and still had where they circled to touch them up. There were also a few spots around the house that needed to be touched up due to settling. That was the biggest issue we noticed during the walk through. The PM then had a packet to go over that we needed to sign off on. He then gave us a folder with a thumb drive with all the info on it you need for the house. The meeting lasted about an hour. Make sure not to bring kids since the PM goes over a lot of information in the packet.

No comments:

Post a Comment